You were hired as a geotechnical engineer in the XYZ Construction company. Your boss has asked you to estimate the settlement of a new building project that your firm just won the bid. Based on your extensive knowledge on geotechnical engineering and statistical analysis, you estimate that the settlement of the building will not exceed 2 inches with 95% probability. From a record of performance of many similar structures built on similar soil conditions, you also find that the coefficient of variation of the settlement is 20%. After showing the calculation to your boss, she still has few concerns about the settlement. Requried:
Assuming a normal distribution is used to model the settlement of this project, your boss asks you to give her the probability that this building will settle more than 2.5 inches

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
Given ab and cb are tangents of p, and m =10°. what is the measure of abp?
Answers: 3
question
Mathematics, 21.06.2019 22:30
Factor the polynomial by its greatest common monomial factor.
Answers: 1
question
Mathematics, 21.06.2019 23:10
In which quadrant does the point lie? write the coordinates of the point. a. quadrant ii; (–2, –4) b. quadrant iii; (2, 4) c. quadrant iii; (–2, –4) d. quadrant iv; (–4, –2)
Answers: 3
question
Mathematics, 22.06.2019 00:30
Vertical angles must check all that apply
Answers: 3
You know the right answer?
You were hired as a geotechnical engineer in the XYZ Construction company. Your boss has asked you t...
Questions
question
Mathematics, 12.01.2020 21:31
Questions on the website: 13722363