subject
Mathematics, 04.07.2020 22:01 alex7881

Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results:Hour Xbar R Hour Xbar R Hour Xbar R Hour Xbar R1 3.15 0.76 7 3.15 0.53 13 3.21 0.80 19 3.31 1.662 3.10 1.13 8 2.65 1.08 14 2.83 1.31 20 2.99 1.143 3.12 1.48 9 2.92 0.76 15 3.12 1.01 21 2.65 1.034 3.49 1.31 10 2.85 1.28 16 2.74 0.55 22 3.28 0.415 3.17 1.22 11 2.93 1.17 17 2.86 1.43 23 2.94 1.636 2.86 0.37 12 3.07 0.35 18 2.84 1.34 24 2.54 0.92Based on the sampling done, the control limits for 3-sigma x overbarx chart are (round all intermediate calculations to three decimal places before proceeding with furthercalculations):Upper Control Limit (UCL Subscript x overbarUCLx) = ?Lower Control Limit (LCL Subscript x overbarLCLx) = ?Based on the x overbarx-chart, the wire cutting process has beenIN CONTROL or OUT OF CONTROL?The control limits for the 3-sigma R-chart are (round all intermediate calculations to three decimal places before proceeding with further calculations):Upper Control Limit (UCL Subscript Upper RUCLR) = ?Lower Control Limit (LCL Subscript Upper RLCLR) = ?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
Kenzie lives 30 kilometers from her cousin houde she drives 23 kilometers before stopping for gas how many meters does she need to travel
Answers: 1
question
Mathematics, 21.06.2019 16:40
Which of the following is most likely the next step in the series? a3z, b6y, c9x, d12w, е15v, f18u
Answers: 2
question
Mathematics, 21.06.2019 20:00
Abcd is a square. what is the measure of angle bac
Answers: 2
question
Mathematics, 21.06.2019 20:40
Ineed someone to me answer my question i have to have this done and knocked out
Answers: 2
You know the right answer?
Sampling 4 pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24...
Questions
Questions on the website: 13722363