There are two phases in completing a construction project. The mean time taken to complete Phase I is 16 months, with a standard deviation of 4 months. The mean time taken to complete Phase II is 12 months, with a standard deviation of 3 months. The correlation between the time taken to complete Phase I and Phase II is -0.6, because if Phase I takes a longer time to complete, the construction company tries to rush through Phase II. What is the standard deviation for the total time taken to complete both phases of the project?
Answers: 3
Mathematics, 21.06.2019 17:00
Acylinder has volume 45π and radius 3. what is it’s height?
Answers: 2
Mathematics, 21.06.2019 17:00
Find the measure of the interior angles of the following regular polygons: a triangle, a quadrilateral, a pentagon, an octagon, a decagon, a 30-gon, a 50-gon, and a 100-gon.
Answers: 2
Mathematics, 21.06.2019 17:50
Bill works as a waiter and is keeping track of the tips he ears daily. about how much does bill have to earn in tips on sunday if he wants to average $22 a day? tips by day tips (dollars) monday tuesday wednesday thursday friday saturday $14 $22 $28 $36
Answers: 1
There are two phases in completing a construction project. The mean time taken to complete Phase I i...
Mathematics, 04.09.2020 03:01
English, 04.09.2020 03:01
Mathematics, 04.09.2020 03:01
Chemistry, 04.09.2020 03:01
History, 04.09.2020 03:01