subject
Mathematics, 06.06.2020 02:01 koolgurl2003

A plumber laying 500meters of drain pipe requires 20men working for 10days. What length in meters would be laid by 50men in 5days, if they all work at same rate?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Arandom sample of 150 high school students were asked whether they have a job. the results are shown in the table. have a job do not have a job male 48 35 female 41 26 select a ord or phrase from the drop-down menus to correctly complete the statements describing the association.
Answers: 1
question
Mathematics, 21.06.2019 18:40
Aportion of a hiking trail slopes downward at about an 84° angle. to the nearest tenth of a flot, what is the value of x, the distance the hiker traveled along the path, if he has traveled a horizontal distance of 120 feet? a. 143.3 b. 12.5 c. 120.7 d. 130.2
Answers: 1
question
Mathematics, 21.06.2019 19:00
Hector and alex traded video games. alex gave hector one fourth of his video games in exchange for 6 video games. then he sold 3 video games and gave 2 video games to his brother. alex ended up with 16 video games. how many video games did alex have when he started?
Answers: 2
question
Mathematics, 21.06.2019 23:30
Alex's monthly take home pay is $2,500. what is the maximum bad debt payment he can maintain without being in credit overload?
Answers: 2
You know the right answer?
A plumber laying 500meters of drain pipe requires 20men working for 10days. What length in meters wo...
Questions
question
Mathematics, 03.08.2021 14:00
question
Health, 03.08.2021 14:00
question
Mathematics, 03.08.2021 14:00
question
English, 03.08.2021 14:00
Questions on the website: 13722362