subject
Mathematics, 30.05.2020 16:57 tangia

Ace Novelty wishes to produce three types of souvenirs: type A, B, C. To manufacture a type-A souvenir requires 2 minutes on machine I, 1 minute on machine II, and 2 minutes on machine III. A Type-B souvenir requires 1 minute on machine I, 3 minutes on machine II, and 1 minute on machine III. A type C souvenir requires 1 minute on machine I and 2 minutes each on machines II and III. There are 3 hours available on machine I, 5 hours available on machine II, and 4 hours on machine III, for processing the order. How many souvenirs of each type should Ace Novelty make in order to use all of the available time

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:30
Arrange these numbers from least to greatest 3/5 5/7 2/9
Answers: 2
question
Mathematics, 21.06.2019 15:30
After being rearranged and simplified, which of the following equations could be solved using the quadratic formula? check all that apply. a. 9% + 3x2 = 14 + x-1 b. -x+ + 4x + 7 = -32-9 c. 5x + 4 = 3x4 - 2 d. 2x2 + x2 + x = 30
Answers: 1
question
Mathematics, 21.06.2019 16:40
The sum of two numbers is 86, and their difference is 20. find the two numbers
Answers: 2
question
Mathematics, 21.06.2019 18:00
What is the measure of the smallest angle in the diagram? 15 29 32 45
Answers: 2
You know the right answer?
Ace Novelty wishes to produce three types of souvenirs: type A, B, C. To manufacture a type-A souven...
Questions
question
Mathematics, 19.11.2020 23:30
Questions on the website: 13722359