subject
Mathematics, 27.05.2020 18:03 Sarahinator04

According to the data set, where should the
upper quartile line of the box plot be placed?
45 47 48 49 51 53 55 55 56 57 64
Water Collection Times in Minutes

40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:10
Pls! does anybody know a shortcut for answering these types of questions in the future?
Answers: 3
question
Mathematics, 21.06.2019 19:30
What is the lcm of 16 and 40 ? 24 and 40 ?
Answers: 2
question
Mathematics, 21.06.2019 20:30
Someone answer asap for ! a ball is rolled down a ramp. the height, f(x), in meters, of the ball x seconds after it is released is modeled by the function f(x) = x²- 10x + 25 for all values of x from 0 to 5. which statement about the ball is true? a. the maximum height of the ball is 5 meters b. the height of the ball increases from 0 to 5 meters above the ground. c. the ball has traveled 5 meters when it reaches the bottom of the ramp. d. the ball has been traveling for 5 seconds when it reaches the bottom of the ramp
Answers: 1
question
Mathematics, 21.06.2019 22:30
If a flying disk is 139 meters in the air and travels at an average of 13 m/s how long is it in the air
Answers: 2
You know the right answer?
According to the data set, where should the
upper quartile line of the box plot be placed?
Questions
question
Mathematics, 20.11.2020 02:50
question
Mathematics, 20.11.2020 02:50
question
English, 20.11.2020 02:50
question
Health, 20.11.2020 02:50
Questions on the website: 13722367