subject
Mathematics, 28.05.2020 05:00 airiyannag0113

Company ABC has one thermostat, two boilers, and one water gauge. For a company to be properly heated, the thermostat and a minimum of one boiler must be operational (both boilers can also be operational). The water gauge is not a factor. History shows that each boiler is operational 72% of the time. The thermostat is operational 94% of the time and the water gauge is operational 87% of the time. Failures of either the thermostat, boilers or water gauge are independent of each other. What is the probability that company ABC is properly heated.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
What number should be added to both sides of the equation to complete this square? x^2-10x=7
Answers: 3
question
Mathematics, 21.06.2019 17:00
Suppose a pendulum is l meters long. the time,t,in seconds that it tales to swing back and forth once is given by t=2.01
Answers: 1
question
Mathematics, 21.06.2019 18:00
Find the number of real number solutions for the equation. x2 + 5x + 7 = 0 0 cannot be determined 1 2
Answers: 2
question
Mathematics, 21.06.2019 19:00
What is the percentile for data value 6 in the following data set? 4 13 8 6 4 4 13 6 4 13 2 13 15 5 9 4 12 8 6 13 40 25 35 62
Answers: 2
You know the right answer?
Company ABC has one thermostat, two boilers, and one water gauge. For a company to be properly heate...
Questions
question
English, 08.04.2021 07:00
question
Mathematics, 08.04.2021 07:00
Questions on the website: 13722363