subject
Mathematics, 23.05.2020 04:59 emilyy6425

The ElectroTech Engineering manufactures two industrial sized electrical devices: generators and alternators. Both of these products require wiring and testing during the assembly process. Each generator requires 5 hours of wiring and 1 hour of testing and can be sold for a $250 profit. Each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $150 profit. There are 260 hours of wiring time and 140 hours of testing time available in the next production period. Due to a backlog, at least 50 alternators are required to be produced. The company wants to maximize profit.

Required:
a. Formulate an LP model for this problem.
b. Sketch the feasible region for this problem.
c. Determine the optimal solution to this problem using level curves.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 19:40
Which of the following could be the ratio of the length of the longer leg 30-60-90 triangle to the length of its hypotenuse? check all that apply. a. 313 6 b. 3: 215 c. 18: 13 d. 1: 13 e. 13: 2 of. 3: 15
Answers: 3
question
Mathematics, 21.06.2019 20:00
You have 138.72 in your saving account u take out 45.23 and 18.00 you deposit 75.85 into your account
Answers: 1
question
Mathematics, 21.06.2019 22:00
Find two numbers if their sum is 91 and the ratio is 6: 7?
Answers: 1
question
Mathematics, 22.06.2019 02:30
Use corrrct notations to name the sides
Answers: 1
You know the right answer?
The ElectroTech Engineering manufactures two industrial sized electrical devices: generators and alt...
Questions
question
Spanish, 25.06.2019 16:30
Questions on the website: 13722359