When building a house, the number of days required to build is inversely
proportional to with...
Mathematics, 23.04.2020 23:41 emily743
When building a house, the number of days required to build is inversely
proportional to with the number of workers. One house was built in 57 days by 6
workers. How many days would it take to build a similar house with 19 workers?
Answers: 3
Mathematics, 21.06.2019 19:50
Prove (a) cosh2(x) ā sinh2(x) = 1 and (b) 1 ā tanh 2(x) = sech 2(x). solution (a) cosh2(x) ā sinh2(x) = ex + eāx 2 2 ā 2 = e2x + 2 + eā2x 4 ā = 4 = . (b) we start with the identity proved in part (a): cosh2(x) ā sinh2(x) = 1. if we divide both sides by cosh2(x), we get 1 ā sinh2(x) cosh2(x) = 1 or 1 ā tanh 2(x) = .
Answers: 3
Mathematics, 21.06.2019 21:00
Askateboard ramp is in the shape of a right triangle what is the height of the ramp
Answers: 3
Mathematics, 22.06.2019 04:00
Acollege student takes out a $7500 loan from a bank. what will the balance of the loan be after one year(assuming the student has not made any payments yet) a. if bank charges 3.8% interest each year ?
Answers: 2
Physics, 14.12.2020 22:30
English, 14.12.2020 22:30
Chemistry, 14.12.2020 22:30
Mathematics, 14.12.2020 22:30
History, 14.12.2020 22:30
English, 14.12.2020 22:30
English, 14.12.2020 22:30