subject
Mathematics, 20.04.2020 21:58 Robinlynn228

A paving company was hired to make a 4 mile section of the highway. They need 700 tons of concrete to complete the job. How many pounds of concrete will they need to repave the highway?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:00
The tuition costs, c, for a local community college are modeled by c(h) = 250 + 200h, where h represents the number of credit hours taken. the local state university has tuition costs, s, modeled by the function s(h) = 300 + 180h. how many credit hours will a student have to take for the two tuition costs to be equal? round the answer to the nearest tenth of an hour.
Answers: 3
question
Mathematics, 21.06.2019 21:00
Construct the graph that models the given situation
Answers: 1
question
Mathematics, 22.06.2019 01:00
The measures of the angles in △abc are given by the expressions in the table. angle measure angle a 65° angle b (3x−10)° angle c (2x)∘ find the value of x. then find the m∠b and m∠c.
Answers: 1
question
Mathematics, 22.06.2019 02:10
If point cis between points a and b, then ac + — = ab
Answers: 1
You know the right answer?
A paving company was hired to make a 4 mile section of the highway. They need 700 tons of concrete t...
Questions
question
Arts, 02.11.2021 23:10
question
English, 02.11.2021 23:10
question
Biology, 02.11.2021 23:10
question
Physics, 02.11.2021 23:10
Questions on the website: 13722360