subject
Mathematics, 14.04.2020 23:52 Bunnybear8099

Company A uses a new production method to manufacture aircraft altimeters. A simple random sample of new altimeters resulted in errors listed below. Use a 0.05 level of significance to test the claim that the new production method has errors with a standard deviation greater than 32.2 ft, which was the standard deviation for the old production method. If it appears that the standard deviation is greater, does the new production method appear to be better or worse than the old method? Should the company take any action?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 12:30
If f(x) = 3-2x and g(x) =1/x+5 to what is the value (f/g)(8)
Answers: 2
question
Mathematics, 22.06.2019 01:00
Ameteorologist is studying the monthly rainfall in a section of the brazilian rainforest. she recorded the monthly rainfall, in inches, for last year. they were: 10.4, 10.3, 11.7, 11.1, 8.0, 4.4, 2.6, 1.8, 2.5, 4.4, 7.3, 9.5 fill in the missing values in the formula. what is the variance?
Answers: 1
question
Mathematics, 22.06.2019 01:30
Which ordered pair is the best estimate for the solution of the system of equations? the graph of the system of equations : y = 3/2x +6 and y=1/4x - 2 , -3) .5, -3.5) , -4) , -3.5)
Answers: 3
question
Mathematics, 22.06.2019 04:00
Its due 1. what is the product of 1/2-1/4? write your answer in standard form.a) show your work.b) is the product of 1/2x-1/4 and 5x^2-2x+6 equal to product of 1/4x-1/2 and 5x^2-2x+6? explain your answer.
Answers: 1
You know the right answer?
Company A uses a new production method to manufacture aircraft altimeters. A simple random sample of...
Questions
Questions on the website: 13722362