subject
Mathematics, 08.04.2020 03:07 loveagirl111puppy

In a cannery, assembly lines I, II, and III account for 40, 40, and 20 percent of the total output. If 0.4 percent of the cans from assembly line I are improperly sealed, and the corresponding percentages from assembly line II and III are 0.3 percent and 0.3 percent, what is the probability P that a can produced by this cannery will be improperly sealed, and what is the probability Q that an improperly sealed can will have come from assembly line I?a. P = 0.0034; Q = 0.7353.

b. P = 0.00755; Q = 0.3434.

c. P = 0.006875; Q = 0.3434.

d. P = 0.00825; Q = 0.364.

e. P = 0.006875; Q = 0.3636.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 15:30
Using two or more complete sentences, describe how you can find a vector parallel to b=-2,3
Answers: 2
question
Mathematics, 21.06.2019 16:00
Find x to the nearest hundredth place
Answers: 2
question
Mathematics, 21.06.2019 21:30
Using the information in the customer order, determine the length and width of the garden. enter the dimensions. length: feet width: feet
Answers: 3
question
Mathematics, 22.06.2019 01:00
Drag statements and reasons to each row to show why the slope of the line between d and e is the same as the slope between e and f, given that triangles a and b are similar.
Answers: 2
You know the right answer?
In a cannery, assembly lines I, II, and III account for 40, 40, and 20 percent of the total output....
Questions
question
History, 30.11.2021 23:20
question
Mathematics, 30.11.2021 23:20
Questions on the website: 13722367