subject
Mathematics, 07.04.2020 16:22 4804053670

A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a random sample of 36 bolts is selected and the bolt diameters recorded. If the resulting sample mean is less than 0.730 inches or greater than 0.770 inches, the process is shut down for adjustment. The standard deviation for diameter is 0.04 inches. What is the probability that the manufacturing line will be shut down unnecessarily? (Hint: Find the probability of observing an x in the shutdown range when the true process mean really is 0.75 inches. Round your answer to four decimal places.)

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:00
What is the least common multiple of 6 and 17?
Answers: 3
question
Mathematics, 21.06.2019 16:30
We have enough material to build a fence around a station that has a perimeter of 180 feet the width of the rectangular space must be 3 1/4 feet what must the length be
Answers: 1
question
Mathematics, 21.06.2019 22:00
Type the correct answer in the box. consider the system of linear equations below. rewrite one of the two equations above in the form ax + by = c, where a, b, and c are constants, so that the sum of the new equation and the unchanged equation from the original system results in an equation in one variable.
Answers: 2
question
Mathematics, 22.06.2019 01:30
If cos(θ)=2853 with θin q iv, what is sin(θ)?
Answers: 2
You know the right answer?
A manufacturing process is designed to produce bolts with a 0.75-inch diameter. Once each day, a ran...
Questions
question
Mathematics, 07.12.2020 05:20
Questions on the website: 13722361