Mathematics, 07.04.2020 12:45 bigchow
Suppose that the minimum number of buses required during the ith hour of the day be denoted by bi (i=1,…,24). Each bus works for 6 consecutive hours. If the number of buses during the ith hour is more than bi, then a cost (Ci) incurs per hour per bus. Formulate the problem as a linear programming problem to minimize the total cost of extra buses.
Answers: 2
Mathematics, 21.06.2019 19:20
Which of the following quartic functions has x = –1 and x = –2 as its only two real zeroes?
Answers: 1
Mathematics, 21.06.2019 21:50
(x-5)1/2+5=2 what is possible solution of this equation
Answers: 1
Suppose that the minimum number of buses required during the ith hour of the day be denoted by bi (i...
Mathematics, 12.10.2020 01:01
Mathematics, 12.10.2020 01:01
Spanish, 12.10.2020 01:01
Geography, 12.10.2020 01:01
Physics, 12.10.2020 01:01
Mathematics, 12.10.2020 01:01
History, 12.10.2020 01:01
Computers and Technology, 12.10.2020 01:01
History, 12.10.2020 01:01