Mathematics, 07.04.2020 04:12 grantjaylynn

A project has an expected duration of 34 weeks with a critical path variance of 6.
1) Suppose the project network is given and the critical path is identified on the network.
2) Suppose the normal time, crash time, and the associated cost for each activity is given.
You have been asked by your supervisor to prepare a research paper that addresses the follow criteria:
a) What is the probability that the project will be completed in 32 weeks or less?
b) If the project is to be shortened by four days, list the process you would take to determine which activities, in order of reduction, would be shortened and the resulting cost.
c) Describe project cost and the requirements for its determination and application ina production facility.
d) Analyze the implications of changes in the parameters of project timing and cost determination.
e) Evaluate the application of project cost and timing concepts on a firm's business operations. What is the probability that the project will be completed in 32 weeks or less?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Which undefined geometric term is described as a location on a coordinate plane that is designed by an ordered pair (x,y) ?
Answers: 1
question
Mathematics, 21.06.2019 17:00
An air conditioning system can circulate 350 cubic feet of air per minute. how many cubic yards of air can it circulate per minute?
Answers: 3
question
Mathematics, 21.06.2019 17:30
Sheila wants to bake six muffins but the recipe is for 12 muffins . this means you only need half of the ingredients listed how much of the of each ingredient does she need? one cup and banana chips ,7 tablespoons oil , two eggs, 3/4 cups flour 1/4 cup walnuts show all you work and justify your answer using a baby toulmin.
Answers: 3
question
Mathematics, 21.06.2019 18:40
What dimensions can créate more than one triangle ?
Answers: 1
You know the right answer?
A project has an expected duration of 34 weeks with a critical path variance of 6.
1) Suppose...
Questions
question
Social Studies, 25.02.2021 03:40
question
Biology, 25.02.2021 03:40
question
Mathematics, 25.02.2021 03:40
question
Mathematics, 25.02.2021 03:40
question
History, 25.02.2021 03:40
Questions on the website: 13722361