subject
Mathematics, 03.04.2020 00:41 brianna1096

A contractor is roofing a house. The contractor considers a roof to be steep when the roof rises 99 in., or more, for every 12 in. it runs. The following graph is a model of how steep the roof is. Does the contractor believe the roof is steep, and what is the slope of the roof?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
Identify the converse of the following conditional: if a point is in the first quadrant, then its coordinates are positive. if the coordinates of a point are not positive, then the point is not in the first quadrant. if the coordinates of a point are positive, then the point is in the first quadrant. if a point is in the first quadrant, then its coordinates are positive. if a point is not in the first quadrant, then the coordinates of the point are not positive.
Answers: 2
question
Mathematics, 21.06.2019 17:30
As part of an annual fundraiser to raise money for diabetes research, diane joined a bikeathon. the track she biked on was 1,920 yards long. diane biked 38.5 laps. her sponsors agreed to donate an amount of money for each mile she biked. how many miles did she bike? first fill in the blanks on the left side using the ratios shown. then write your answer. given ratios: 5280ft / 1 mi , 1 mi /5280 ft , 1,920 yards / 1 lap , 1 lap / 1,920 yards , 3 ft / 1 yard , 1 yard / 3 ft. blanks: 38.5 laps / 1 yard x (blank) x (blank) x (blank) = (blank) miles i'm really confused on how to do this, and the explanations aren't exactly . if you could walk me through how to do this, it would be greatly appreciated.
Answers: 1
question
Mathematics, 21.06.2019 18:00
Sandy is ordering bread rolls for her party,she wants 3/5 of the rolls to be whole wheat. what other factions can represent part of the rolls that will be whole wheat? shade the models to show your work.
Answers: 1
question
Mathematics, 21.06.2019 21:00
Simplify -4z+2y-y+-18z a.-22z+y b.-14z+2 c.3y+22z d.y +14z
Answers: 1
You know the right answer?
A contractor is roofing a house. The contractor considers a roof to be steep when the roof rises 99...
Questions
question
Mathematics, 16.06.2020 05:57
question
Mathematics, 16.06.2020 05:57
question
English, 16.06.2020 05:57
question
Biology, 16.06.2020 05:57
Questions on the website: 13722363