Mathematics, 24.03.2020 20:52 tati7149

A contractor estimated that one of his two bricklayers would take 9 hours to build a certain wall and the other 10 hours. However, he knew from experience that when they worked together, 10 fewer bricks got laid per hour. Since he was in a hurry, he put both men on the job and found it took exactly 5 hours to build the wall. How many bricks did it contain?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:40
The height of a triangle is 4 in. greater than twice its base. the area of the triangle is no more than 168 in.^2. which inequalitycan be used to find the possible lengths, x, of the base of the triangle?
Answers: 1
question
Mathematics, 21.06.2019 17:00
What is the arc length when θ =pi over 3 and the radius is 5 cm? (5 points) 5 pi over 3 cm 10 pi over 3 cm 16 pi over 3 cm pi over 3 cm
Answers: 1
question
Mathematics, 21.06.2019 19:30
Asurvey of 2,000 doctors showed that an average of 3 out of 5 doctors use brand x aspirin.how many doctors use brand x aspirin
Answers: 1
question
Mathematics, 21.06.2019 20:30
Write two point-slope equations for the line passing through the points (6, 5) and (3, 1)
Answers: 1
You know the right answer?
A contractor estimated that one of his two bricklayers would take 9 hours to build a certain wall an...