subject
Mathematics, 19.03.2020 09:18 gchippewa81

Atlantic Video, a small video rental store in Philadelphia, is open 24 hours a day, and-due to its proximity to a major business school-experiences customers arriving around the clock. A recent analysis done by the store manager indicates that there are 20 customers arriving every hour, with a standard deviation of interarrival times of 3 minutes. This arrival pattern is consistent and is independent of the time of day. The checkout is currently operated by one employee, who needs an average of 2.55 minutes to check out a customer. The standard deviation of this check-out time is 3 minutes, primarily as a result of customers taking home different numbers of videos.
(a) If you assume that every customer rents at least one video (i. e., has to go to the checkout), what is the average time a customer has to wait in line before getting served by the checkout employee (i. e., waiting time in queue)?
(b) If there are no customers requiring checkout, the employee is sorting returned videos, of which there are always plenty waiting to be sorted.
How many videos can the employee sort over an 8-hour shift (assume no breaks) if it takes exactly 1.5 minutes to sort a single video? Hint: You need to calculate the % of time that the employee is not serving a customer, i. e., idling (think about the meaning of utilization). Then, the total idle time in an 8-hour shift equals (8 hours)*(% of idle time). From there, you can get how many videos on average the employee can sort during an 8-hour shift.
(c) What is the average number of customers who are at the checkout desk, either waiting or currently being served?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 15:40
Need ! discuss how to convert the standard form of the equation of a circle to the general form. 50 points
Answers: 1
question
Mathematics, 21.06.2019 16:30
The ratio of men to women working for a company is 4 to 5 . if there are 90 women working for the company, what is the total number of employees?
Answers: 1
question
Mathematics, 21.06.2019 16:40
Ajar contains a mixture of 20 black marbles, 16 red marbles, and 4 white marbles, all the same size. find the probability of drawing a white or red marble on the first draw. 125 12 01 next question ask for turn it in
Answers: 2
question
Mathematics, 21.06.2019 20:40
The acceleration of an object due to gravity is 32 feet per second squared.what is acceleration due to gravity in inches per second squared?
Answers: 2
You know the right answer?
Atlantic Video, a small video rental store in Philadelphia, is open 24 hours a day, and-due to its p...
Questions
question
Mathematics, 01.07.2020 15:01
question
Business, 01.07.2020 15:01
question
Mathematics, 01.07.2020 15:01
Questions on the website: 13722363