subject
Mathematics, 17.03.2020 22:23 keving4three

Of the two production methods, a company wants to identify the method with the smaller population mean completion time. One sample of workers is selected and each worker first uses one method and then uses the other method. The sampling procedure being used to collect completion time data is based on

a.
matched samples.

b.
worker samples.

c.
pooled samples.

d.
independent samples.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:00
Alawn mower manufacturer incurs a total of 34,816 in overhead costs and 388 per lawn mower in production costs. how many lawn mowers were manufactured if the average cost of productions is 660
Answers: 3
question
Mathematics, 21.06.2019 20:20
Select the correct answer from each drop-down menu. the length of a rectangle is 5 inches more than its width. the area of the rectangle is 50 square inches. the quadratic equation that represents this situation is the length of the rectangle is inches.
Answers: 1
question
Mathematics, 22.06.2019 00:00
During the election for class president, 40% of the students voted for kellen, and 60% of the students voted for robbie. 500 students voted in total. how many more students voted for robbie than for kellen? answer with work : )
Answers: 1
question
Mathematics, 22.06.2019 00:30
How many doughnuts are equal to 20 cookies.? 3 apples = 5 bananas6 cookies = 7 apples2 doughnuts = 1 banana
Answers: 2
You know the right answer?
Of the two production methods, a company wants to identify the method with the smaller population me...
Questions
question
Biology, 25.03.2021 21:40
question
Mathematics, 25.03.2021 21:40
question
English, 25.03.2021 21:40
question
Mathematics, 25.03.2021 21:40
question
Mathematics, 25.03.2021 21:40
question
Mathematics, 25.03.2021 21:40
Questions on the website: 13722367