subject
Mathematics, 16.03.2020 21:30 gagedugan2019

If it takes 8 hours for Sanya to build a fence, and it takes 6 hours for Sean to build the same fence, how long will it take them working together?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:20
The lengths of nails produced in a factory are normally distributed with a mean of 4.91 centimeters and a standard deviation of 0.05 centimeters. find the two lengths that separate the top 4% and the bottom 4%. these lengths could serve as limits used to identify which nails should be rejected. round your answer to the nearest hundredth, if necessary.
Answers: 3
question
Mathematics, 21.06.2019 23:30
What are the measures of angles a, b, and c? show your work and explain your answers. 25 points
Answers: 1
question
Mathematics, 22.06.2019 00:00
If 7x=9y, y/z = 7/5 , then x/z = (a) 2/7 (b) 7/9 (c) 9/5 (d) 9/7 (e) 5/9
Answers: 1
question
Mathematics, 22.06.2019 00:00
Technicians have installed a center pivot, circular irrigator for a farm that covers 25 acres. a.) how long is the irrigation boom (in feet) from the center pivot to its farthest extent? b.) if the irrigation boom makes 4 full revolutions in a day, how many miles does the end of the boom travel in 5 days?
Answers: 1
You know the right answer?
If it takes 8 hours for Sanya to build a fence, and it takes 6 hours for Sean to build the same fenc...
Questions
question
Biology, 31.03.2021 19:20
question
Mathematics, 31.03.2021 19:20
question
Mathematics, 31.03.2021 19:20
question
Mathematics, 31.03.2021 19:20
Questions on the website: 13722363