Mathematics, 12.03.2020 00:43 ella3714
The navy contract was for 2,314 devices and took 23 workers two weeks (40 hours per week) to complete. The army contract was for 4,707 devices that were produced by 16 workers in three weeks. What's the productivity of the army contract for the input of labor hours
Answers: 3
Mathematics, 21.06.2019 15:00
Which of the greatest common gcf of 32 and 48 a 16 b 96 c 8 d 32
Answers: 2
Mathematics, 21.06.2019 18:30
Adoctor administers a drug to a 38-kg patient, using a dosage formula of 50 mg/kg/day. assume that the drug is available in a 100 mg per 5 ml suspension or in 500 mg tablets. a. how many tablets should a 38-kg patient take every four hours? b. the suspension with a drop factor of 10 ggt/ml delivers the drug intravenously to the patient over a twelve-hour period. what flow rate should be used in units of ggt/hr? a. the patient should take nothing pills every four hours. (type an integer or decimal rounded to the nearest hundredth as needed.)
Answers: 1
Mathematics, 21.06.2019 20:00
Solve for x and y a x= 13.3 y= 16.7 b x= 23.3 y= 12.5 c x= 7.5 y= 16.7 d x=7.5 y= 12.5
Answers: 1
Mathematics, 21.06.2019 21:00
Rewrite the following quadratic functions in intercept or factored form. show your work. y = x^2 + 7x + 10
Answers: 2
The navy contract was for 2,314 devices and took 23 workers two weeks (40 hours per week) to complet...
Chemistry, 10.03.2021 20:40
Computers and Technology, 10.03.2021 20:40
Mathematics, 10.03.2021 20:40
Mathematics, 10.03.2021 20:40
Physics, 10.03.2021 20:40
Mathematics, 10.03.2021 20:40
Mathematics, 10.03.2021 20:40
Mathematics, 10.03.2021 20:40
Mathematics, 10.03.2021 20:40