subject
Mathematics, 08.03.2020 07:53 BrianaK2137

A construction worker needs 3 ounds of concrete mix. He has 1 pounds of concrete mix in one bag, and he
has ound of concrete mix in another bag.
How many more pounds of concrete mix does the construction worker need?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:30
Ametal rod is 2/5 meters long. it will be cut into pieces that are each 1/30 meters long. how many pieces will be made from the rod?
Answers: 1
question
Mathematics, 21.06.2019 23:00
The table below shows the function f. determine the value of f(3) that will lead to an average rate of change of 19 over the interval [3, 5]. a. 32 b. -32 c. 25 d. -25
Answers: 2
question
Mathematics, 21.06.2019 23:30
Katie wants to collect over 100 seashells. she already has 34 seashells in her collection. each day, she finds 12 more seashells on the beach. katie can use fractions of days to find seashells. write an inequality to determine the number of days, dd, it will take katie to collect over 100 seashells.
Answers: 1
question
Mathematics, 22.06.2019 02:30
Match each set of points with the quadratic function whose graph passes through those points
Answers: 1
You know the right answer?
A construction worker needs 3 ounds of concrete mix. He has 1 pounds of concrete mix in one bag, and...
Questions
question
History, 29.05.2020 14:58
question
Mathematics, 29.05.2020 14:58
question
Mathematics, 29.05.2020 14:58
question
Mathematics, 29.05.2020 14:58
question
Biology, 29.05.2020 14:58
Questions on the website: 13722363