The operations manager of a body and paint shop has five cars to schedule for repair. He would like to minimize the makespan to complete all work on these cars. Each car requires body work prior to painting. The estimates of the times required to do the body and paint work on each are as follows: Car Body Work (hrs) Paint (hrs) A 10 2 B 5 4 C 7 5 D 3 6 E 1 7 What is the optimum sequence (first car to last)?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 16:00
Apark is in the shape of a rectangle. the park authorities are planning to build a 2-meter-wide jogging path in the park (shown as the shaded region in the image). what is the area of the jogging path? plz
Answers: 1
question
Mathematics, 21.06.2019 19:00
Find the length of the diagonal of the rectangle. round your answer to the nearest tenth. || | | 8 m | | | | 11 m
Answers: 2
question
Mathematics, 21.06.2019 21:30
Select all the statements that apply to this figure
Answers: 2
question
Mathematics, 21.06.2019 22:00
Liz is shipping a package to her friend. the maximum weight of a medium flat-rate box is 20 pounds, including the box which weighs 6 ounces. write and solve an inequality to describe the possible weight in pounds, w, of the contents that liz will ship to her friend if she must use a medium flat-rate box. use the drop-down menus to explain your answer.
Answers: 2
You know the right answer?
The operations manager of a body and paint shop has five cars to schedule for repair. He would like...
Questions
Questions on the website: 13722367