subject
Mathematics, 05.03.2020 18:39 barattah

Two new workers, Andy and Bob, were hired for an assembly line. Andy could process 12 units per minute after one hour and 15 units per minute after two hours. Bob could process 10 units per minute after one hour and 16 units per minute after two hours. Using the above model and assuming that P(0)=0, estimate the maximum number of units per minute that each worker is capable of processing.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 19:00
Lena reflected this figure across the x-axis. she writes the vertices of the image as a'(−2, 8), b'(−5, 6), c'(−8, 8), d'(−4, 2).
Answers: 2
question
Mathematics, 21.06.2019 20:10
21 type the correct answer in the box. use numerals instead of words. if necessary, use / for the fraction bar. the solution set of n2 - 14n = -45 is { (separate the solutions with a comma)
Answers: 3
question
Mathematics, 21.06.2019 21:40
Scores on the cognitive scale of the bayley-scales of infant and toddler development range from 1 to 19, with a standard deviation of 3. calculate the margin of error in estimating the true mean cognitive scale score, with 99% confidence, if there are 12 infants and toddlers in a sample.
Answers: 3
question
Mathematics, 21.06.2019 21:50
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 3
You know the right answer?
Two new workers, Andy and Bob, were hired for an assembly line. Andy could process 12 units per minu...
Questions
question
Mathematics, 17.04.2020 02:28
Questions on the website: 13722367