subject
Mathematics, 02.03.2020 19:43 ctyrector

An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/hour, how many minimum work stations will be needed

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 16:30
What is the binomial expansion of (2x-3)^5
Answers: 1
question
Mathematics, 21.06.2019 17:00
The tuition costs, c, for a local community college are modeled by c(h) = 250 + 200h, where h represents the number of credit hours taken. the local state university has tuition costs, s, modeled by the function s(h) = 300 + 180h. how many credit hours will a student have to take for the two tuition costs to be equal? round the answer to the nearest tenth of an hour.
Answers: 3
question
Mathematics, 21.06.2019 18:40
This stem-and-leaf plot represents the heights of the students on ralph's basketball team. one student's height is missing from the plot. if the mean height of all the students on the team is 61 inches, what is the missing height? a. 55 in. b. 59 in. c. 61 in. d. 65 in.
Answers: 2
question
Mathematics, 21.06.2019 21:30
Abicycle training wheel has a radius of 3 inches. the bicycle wheel has a radius of 10 inches.approximately how much smaller, in square inches and rounded to the nearest hundredth, is the area of the training wheel than the area of the regular wheel? *
Answers: 3
You know the right answer?
An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you...
Questions
question
Mathematics, 05.05.2020 01:17
question
Mathematics, 05.05.2020 01:17
question
Mathematics, 05.05.2020 01:17
question
Mathematics, 05.05.2020 01:17
Questions on the website: 13722363