subject
Mathematics, 01.03.2020 20:42 vane1161

A construction company needs to remove 4 1 6 tons of dirt from a construction site. They can remove 8 9 tons of dirt each hour. What is the total number of hours it will take to remove the dirt

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 20:00
The rectangle shown has a perimeter of 108 cm and the given area. its length is 6 more than five times its width. write and solve a system of equations to find the dimensions of the rectangle.
Answers: 3
question
Mathematics, 21.06.2019 22:30
The dash figure is a dilation if the original figure. find the scale factor. classify the dilation as an enlargement or a reduction
Answers: 2
question
Mathematics, 22.06.2019 00:30
What is the geometric mean of 3 and 7? a) square root of 21 b) 2 square root of 6 c) 2 square root of 7 d) 21
Answers: 2
question
Mathematics, 22.06.2019 01:00
How would you find the height of points on the circle? the topic is trigonometry.
Answers: 3
You know the right answer?
A construction company needs to remove 4 1 6 tons of dirt from a construction site. They can remove...
Questions
question
Physics, 22.02.2021 23:40
question
Mathematics, 22.02.2021 23:40
question
History, 22.02.2021 23:40
Questions on the website: 13722363