subject
Mathematics, 28.02.2020 20:55 zitterkoph

Smith Engineering is in the process of reviewing the salaries of their surveyors. During this review, the company found that an experienced surveyor can survey a roadbed in 7 hours. An apprentice surveyor needs 9 hours to survey the same stretch of road. If the two work together, find how long it takes them to complete the job.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:20
Which of these equations, when solved, gives a different value of x than the other three? a9.1 = -0.2x + 10 b10 = 9.1 + 0.2x c10 – 0.2x = 9.1 d9.1 – 10 = 0.2x
Answers: 1
question
Mathematics, 21.06.2019 20:30
Apinhole camera is made out of a light-tight box with a piece of film attached to one side and pinhole on the opposite side. the optimum diameter d(in millimeters) of the pinhole can be modeled by d=1.9[ (5.5 x 10^-4) l) ] ^1/2, where l is the length of the camera box (in millimeters). what is the optimum diameter for a pinhole camera if the camera box has a length of 10 centimeters
Answers: 1
question
Mathematics, 21.06.2019 23:00
Find the rate at which the water is now flowing from the tap give your answer cubic centimetres per second
Answers: 1
question
Mathematics, 21.06.2019 23:30
The average daily maximum temperature for laura’s hometown can be modeled by the function f(x)=4.5sin(πx/6)+11.8 , where f(x) is the temperature in °c and x is the month. x = 0 corresponds to january.what is the average daily maximum temperature in may? round to the nearest tenth of a degree if needed.use 3.14 for π .
Answers: 1
You know the right answer?
Smith Engineering is in the process of reviewing the salaries of their surveyors. During this review...
Questions
question
English, 27.08.2020 01:01
question
Social Studies, 27.08.2020 01:01
question
Law, 27.08.2020 01:01
Questions on the website: 13722363