A PERT analysis of a small project determined that the duration of the critical path is 10 weeks with a variance of 2 weeks. What project duration can be promised that will have only a 5% chance of time overrun?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
Which equation can be used to measure the density of water in a spherical water tank? let w represent the number of water particles within the region.
Answers: 3
question
Mathematics, 22.06.2019 03:00
Write each rational number in the form a/b, where a and b are integers. 1. 5 1/6 2. -12
Answers: 1
question
Mathematics, 22.06.2019 04:30
0.75,1.75,2.75,3.75 is arithmetic or geometric?
Answers: 1
question
Mathematics, 22.06.2019 05:40
Abookstore owner is having a sale the book bart wants was originally priced at $14.99 the book is now $10.04 by what percentage was the price reduced
Answers: 1
You know the right answer?
A PERT analysis of a small project determined that the duration of the critical path is 10 weeks wit...
Questions
question
English, 07.07.2019 17:00
question
Mathematics, 07.07.2019 17:00
question
Biology, 07.07.2019 17:00
Questions on the website: 13722367