subject
Mathematics, 26.02.2020 03:19 antasia12342

The Electrotech Corporation manufactures two industrialosized electrical devices: generators and atternators- Both ofthese products require wiring and testing during the assembly process. Each generator requires 2 hours of wiring and 1hour of testing and can be sold for a $250 profit Each alternator requires 3 hours of wiring and 2 hours of testing and canbe sold for a $150 profit There are 260 hours of wiring time and 140 hours of testing time available in the next productionperiod, and Electrotech wants to maximize profit. a. Formulate an LP model for this problemb. Sketch the feasible region for this problem. c Determine the optimal solution to this problem using level curves.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 15:00
Which of these choices show a pair of equivalent expressions?
Answers: 1
question
Mathematics, 21.06.2019 17:00
Let f(x)=2x and g(x)=2x. graph the functions on the same coordinate plane. what are the solutions to the equation f(x)=g(x) ?me asap
Answers: 2
question
Mathematics, 21.06.2019 20:30
W-16=-12 solve each one step equation plz
Answers: 2
question
Mathematics, 21.06.2019 23:30
Segment wx is shown explain how you would construct a perpendicular bisector of wx using a compass and a straightedge
Answers: 1
You know the right answer?
The Electrotech Corporation manufactures two industrialosized electrical devices: generators and att...
Questions
question
Mathematics, 12.12.2020 16:00
question
Mathematics, 12.12.2020 16:00
question
Mathematics, 12.12.2020 16:00
question
Mathematics, 12.12.2020 16:00
Questions on the website: 13722367