subject
Mathematics, 17.02.2020 18:06 Bunnybear3384

We want to decide whether to employ a human operator or buy a machine to paint steel beams with a rust inhibitor. Steel beams are produced at a constant rate of one every 14 minutes. A skilled human operator takes an average time of 700 seconds to paint a steel beam, with a standard deviation of 300 seconds. An automatic painter takes on average 40 seconds more than the human painter to paint a beam, but with a standard deviation of only 150 seconds. Estimate the expected waiting time in queue of a steel beam for each of the operators, as well as the expected number of steel beams waiting in queue in each of the two cases. Comment on the effect of variability in service time.

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Abee with velocity vector r'(t) starts out at (5, βˆ’5, βˆ’3) at t = 0 and flies around for 5 seconds. where is the bee located at time t = 5 if 5 0 r'(u)du = 0?
Answers: 1
question
Mathematics, 21.06.2019 17:50
The length and width of a rectangle are consecutive even integers the area of the rectangle is 120 squares units what are the length and width of the rectangle
Answers: 1
question
Mathematics, 21.06.2019 21:30
Awater truck is filling a swimming pool. the equation that represents this relationship is y=19.75x where y is the number of gallons of water in the pool and x is the number of minutes the truck has been filling the pool.
Answers: 1
question
Mathematics, 21.06.2019 23:30
Need solving this 2nd limit problem.
Answers: 1
You know the right answer?
We want to decide whether to employ a human operator or buy a machine to paint steel beams with a ru...
Questions
question
Mathematics, 01.02.2021 23:30
question
Mathematics, 01.02.2021 23:30
question
Biology, 01.02.2021 23:30
question
Mathematics, 01.02.2021 23:30
question
Mathematics, 01.02.2021 23:30
Questions on the website: 13722367