A work crew spent four days paving a stretch of road. The table below shows
the length of road...
Mathematics, 16.02.2020 21:54 bladencharles8845
A work crew spent four days paving a stretch of road. The table below shows
the length of road paved each day.
ROAD PAVING
Day
Length (miles)
Monday 5.5/6
Tuesday 6.3/6
Wednesday 8.4/6
Thursday 4.1/6
The entire length of the road will be 27 miles. What is the total remaining
length of road that needs to be paved after the four days?
Show your work.
Answers: 3
Mathematics, 21.06.2019 17:00
Determine the fraction of total interest owed. after the fourth month of a 12-month loan: the numerator is: {(n + ) + (n + ) + (n + ) + (n + )} = , and the denominator is: {(n) + (n + 1) + + (n + )} = . therefore, the fraction is numerator/denominator (to the nearest tenth) =
Answers: 1
Mathematics, 21.06.2019 20:00
Prove that the value of the expression 7^8–7^7+7^6 is divisible by 43.
Answers: 1
Mathematics, 21.06.2019 20:00
It is given that the quadratic equation hx²-3x+k=0, where h and k are constants, has roots [tex] \beta \: and \: 2 \beta [/tex]express h in terms of k
Answers: 2
Mathematics, 21.06.2019 21:30
The perimeter of a rectangular lot of land is 436 ft. this includes an easement of x feet of uniform width inside the lot on which no building can be done. if the buildable area is 122 ft by 60 ft, determine the width of the easement. select one: a. 9 feet b. 18 feet c. 4.5 feet d. 7 feet
Answers: 3
Mathematics, 13.09.2019 00:30
Computers and Technology, 13.09.2019 00:30
Mathematics, 13.09.2019 00:30