subject
Mathematics, 11.02.2020 20:48 abby4902

Future production requirements in the turret lathe department must be satisfied through the acquisition of several new machines and the hiring of new operators, the exact number to be determined. There are three new parts that will be produced. Part A has annual quantities of 20,000 units; part B, 32,000 units; and part C, 47,000 units. Corresponding standard times for these parts are 7.3 min, 4.9 min, and 8.4 min, respectively. The department will operate one 8-hour shift for 250 days/yr. The machines are expected to be 98% reliable, and the anticipated scrap rate is 4%. Worker efficiency is expected to be 100%. How many new turret lathes and operators are required to meet these production requirements?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
What power can you write to represent the volume of the cube shown? write the power as an expression with a base and an exponent and then find the volume of the cube
Answers: 3
question
Mathematics, 21.06.2019 18:30
What is the answer to this question? i'm a bit stumped. also how do i do it? 5(x - 4) = 2(x + 5)
Answers: 1
question
Mathematics, 21.06.2019 21:00
Gabriel determined that his total cost would be represented by 2.5x + 2y – 2. his sister states that the expression should be x + x + 0.5x + y + y – 2. who is correct? explain.
Answers: 2
question
Mathematics, 21.06.2019 21:50
What is the missing reason in the proof? segment addition congruent segments theorem transitive property of equality subtraction property of equality?
Answers: 3
You know the right answer?
Future production requirements in the turret lathe department must be satisfied through the acquisit...
Questions
question
Spanish, 21.09.2019 21:30
question
Physics, 21.09.2019 21:30
question
Mathematics, 21.09.2019 21:30
Questions on the website: 13722361