2-41 the time to complete a construction project is normally distributed with a mean of 60 weeks and a standard deviation of 4 weeks. what is the probability the project will be finished in 62 weeks or less? 62-60/4=2/4=0.5=69146 what is the probability the project will be finished in 66 weeks or less? 66-60/4=6/4=1.5 what is the probability the project will take longer than 65 weeks?

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
The blue whale is the largest animal living on the earth. the average blue whale measures 100 feet long (30 meters) and weighs 300,000 pounds (136,000 kilograms). a whale’s head is 1⁄3 of the length of its body. a new baby whale is 1⁄4 the length of a grown whale. the average man is 1⁄17 the length of a blue whale, and 1⁄1,818 its weight. a human baby measures 1⁄4 of the length of an adult. calculate the following information: how long is a whale’s head? how long is a new baby whale? how tall is the average man? how much does the average man weigh? how tall is the average human baby?
Answers: 3
question
Mathematics, 21.06.2019 20:00
Prove that the value of the expression 7^8–7^7+7^6 is divisible by 43.
Answers: 1
question
Mathematics, 21.06.2019 21:40
Scores on the cognitive scale of the bayley-scales of infant and toddler development range from 1 to 19, with a standard deviation of 3. calculate the margin of error in estimating the true mean cognitive scale score, with 99% confidence, if there are 12 infants and toddlers in a sample.
Answers: 3
question
Mathematics, 21.06.2019 23:00
The equation represents the function f, and the graph represents the function g. f(x)=3(5/2)^x determine the relationship between the growth factors of f and g. a. the growth factor of g is twice the growth factor of f. b. the growth factor of f is twice the growth factor of g. c. the growth factor of f is 2.5 times the growth factor of g. d. the growth factor of f is the same as the growth factor of g.
Answers: 3
You know the right answer?
2-41 the time to complete a construction project is normally distributed with a mean of 60 weeks and...