subject
Mathematics, 19.12.2019 00:31 savannahvargas512

Atotal of 13,000 sheet metal stampings must be produced in the press department during the next three days. manually operated presses (one operator per press) will be used to complete the job and the cycle time is 27 sec. each press must be set up with a punch-and-die set before production starts. setup time is 2.0 hr, and availability is assumed to be 100%. how many presses and operators must be devoted to this production during the three days, if there are 7.5 hr of available time per machine per day?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Will give find an equivalent function to f(x)=5(2)^3x. the 5(2)^3x means 5(2) to the 3x power answer choices: a: f(x)=125^x(8)^x b: f(x)=10^2x c: f(x)=40^x d: f(x)=5(8)^x
Answers: 3
question
Mathematics, 21.06.2019 17:30
Sheila wants to bake six muffins but the recipe is for 12 muffins . this means you only need half of the ingredients listed how much of the of each ingredient does she need? one cup and banana chips ,7 tablespoons oil , two eggs, 3/4 cups flour 1/4 cup walnuts show all you work and justify your answer using a baby toulmin.
Answers: 3
question
Mathematics, 21.06.2019 19:10
What is the absolute value of the complex number -4-sqrt2i
Answers: 2
question
Mathematics, 21.06.2019 19:30
Use multiples to write two fractions equivalent to 7/9. 14/18, 8/10 6/8, 21/27 10/12, 28/36 14/18, 21/27
Answers: 1
You know the right answer?
Atotal of 13,000 sheet metal stampings must be produced in the press department during the next thre...
Questions
question
Mathematics, 12.07.2019 04:30
Questions on the website: 13722363