Mathematics, 13.12.2019 21:31 ozzypurple05
Acompany manufactures two types of hand calculators, model c1 and model c2. it takes 1 hour and 4 hours in labor time to manufacture each c1 and c2, respectively. the cost of manufacturing the c1 is $30 and that of manufacturing a c2 is $20. the company has 1,600 hours of labor time available and $18,000 in running costs. the profit on each c1 is $10 and on each c2 is $9. what should the production schedule be to ensure maximum profit?
Answers: 1
Mathematics, 21.06.2019 18:00
In triangle △abc, ∠abc=90°, bh is an altitude. find the missing lengths. ah=4 and hc=1, find bh.
Answers: 3
Mathematics, 22.06.2019 01:40
Amass weighing 16 pounds stretches a spring 8/3 feet. the mass is initially released from rest from a point 2 feet below the equilibrium position, and the subsequent motion takes place in a medium that offers a damping force that is numerically equal to 1/2 the instantaneous velocity. find the equation of motion if the mass is driven by an external force equal to f(t)=cos(2t).
Answers: 2
Acompany manufactures two types of hand calculators, model c1 and model c2. it takes 1 hour and 4 ho...
Mathematics, 23.03.2021 22:40
English, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
Mathematics, 23.03.2021 22:40
English, 23.03.2021 22:40