Asmall manufacturing firm has decided to expand production capacity by adding four machines: (1) a punch press, (2) a grinder, (3) a lathe, and (4) a welding machine. there are only four possible locations: a, b, c, and d. the welding machine will not fit in location b. the material handling costs of locating each of the machines in each of the possible locations are expressed in terms of dollars per hour (where m represents an arbitrarily large cost):
abcd are locations and 1234 are machines
a b c d
1 94 13 62 71
2 62 19 84 96
3 75 88 18 80
4 11 m 81 21
a. what is the optimal assignment of machines to locations?
b. what is the cost associated with the optimal assignment from part a?
Answers: 2
Mathematics, 21.06.2019 13:30
The equation y=mx+b is the slope-intercept form of the equation of a line. what is the equation solved for b? y-m=b y-mx=b y/mx=b y/m-x=b
Answers: 2
Mathematics, 21.06.2019 18:00
Jose predicted that he would sell 48 umbrellas. he actually sold 72 umbrellas. what are the values of a and b in the table below? round to the nearest tenth if necessary
Answers: 2
Asmall manufacturing firm has decided to expand production capacity by adding four machines: (1) a...
Mathematics, 24.03.2020 18:09
Mathematics, 24.03.2020 18:09
Social Studies, 24.03.2020 18:09
Mathematics, 24.03.2020 18:09
Mathematics, 24.03.2020 18:09
Social Studies, 24.03.2020 18:09