subject
Mathematics, 28.11.2019 16:31 superfly903

Adoll factory needed to produce an order of dolls for a shop. the factory
planned to spend 24 days on the production at a rate of 1,500 dolls per
day. due to a technical improvement, the factory produced the dolls 1.6
times as fast as it normally would. how many days did it take the factory
to finish the order of dolls?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 14:10
Can't gugys answer the ratio question. this is urgent the plans of a building is drawn toward scale of 1: 1000. kfc the foyer on the plans measures 62mm by 54mm, how large is the foyer in real life?
Answers: 1
question
Mathematics, 21.06.2019 14:50
Simplify 4 square root of 2 end root plus 7 square root of 2 end root minus 3 square root of 2 . (1 point) 2 square root of 8 8 square root of 2 8 square root of 6 6 square root of 8
Answers: 1
question
Mathematics, 21.06.2019 20:00
Rectangle bcde is similar to rectangle vwxy. what is the length of side vy? a) 1 7 b) 2 7 c) 3 7 d) 4 7
Answers: 3
question
Mathematics, 21.06.2019 20:30
I’m on question 7 it says a covered water tank is in the shape of a cylinder the tank has a 28 inch diameter and a height of 66 inches to the nearest square inch what is the surface area of the water tank
Answers: 2
You know the right answer?
Adoll factory needed to produce an order of dolls for a shop. the factory
planned to spend 24 d...
Questions
question
Mathematics, 27.01.2021 21:40
question
Arts, 27.01.2021 21:40
question
Mathematics, 27.01.2021 21:40
question
Mathematics, 27.01.2021 21:40
question
Mathematics, 27.01.2021 21:40
Questions on the website: 13722367