Mathematics, 27.11.2019 06:31 koolja3

When building a house, the number of days required to build varies inversely with with the number of workers. one house was built in 76 days by 10 workers. how many days would it take to build a similar house with 20 workers?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Find the difference (8ab+a+2) - (3ab+6)
Answers: 1
question
Mathematics, 21.06.2019 18:50
Abag contains 4 red, 7 blue and 5 yellow marbles. event a is defined as drawing a yellow marble on the first draw and event b is defined as drawing a blue marble on the second draw. if two marbles are drawn from the bag, one after the other and not replaced, what is p(b|a) expressed in simplest form? a. 7/16 b. 7/15 c. 14/16 d. 14/15
Answers: 1
question
Mathematics, 21.06.2019 22:30
What is the distance between a and b? round your answer to the nearest tenth. a coordinate plane is shown. point a is located at negative 1, 5, and point b is located at 4, 1. a line segment connects the two points.
Answers: 1
question
Mathematics, 21.06.2019 23:30
Solve the following: 12(x^2–x–1)+13(x^2–x–1)=25(x^2–x–1) 364x–64x=300x
Answers: 1
You know the right answer?
When building a house, the number of days required to build varies inversely with with the number of...
Questions
question
English, 12.07.2019 00:30
Questions on the website: 13722362