Mathematics, 12.11.2019 04:31 lilGi0

All the members of a construction crew work at the same pace. six of them working together are able to pour foundation in 22 hours. how many hours would this job take if the number of workers increased by factor of 2?

if possible show work

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 16:50
Which three lengths could be the lengths of the sides of a triangle? 21 cm, 7 cm, 7 cm 9 cm, 15 cm, 22 cm 13 cm, 5 cm, 18 cm 8 cm, 23 cm, 11 cm
Answers: 2
question
Mathematics, 21.06.2019 19:50
Drag each tile into the correct box. not all tiles will be used. find the tables with unit rates greater than the unit rate in the graph. then tenge these tables in order from least to greatest unit rate
Answers: 2
question
Mathematics, 21.06.2019 20:30
Apinhole camera is made out of a light-tight box with a piece of film attached to one side and pinhole on the opposite side. the optimum diameter d(in millimeters) of the pinhole can be modeled by d=1.9[ (5.5 x 10^-4) l) ] ^1/2, where l is the length of the camera box (in millimeters). what is the optimum diameter for a pinhole camera if the camera box has a length of 10 centimeters
Answers: 1
question
Mathematics, 21.06.2019 23:00
What is the circumference of the pie
Answers: 2
You know the right answer?
All the members of a construction crew work at the same pace. six of them working together are able...
Questions
question
Mathematics, 15.02.2022 04:40
question
Mathematics, 15.02.2022 04:50
question
Business, 15.02.2022 04:50
question
Mathematics, 15.02.2022 04:50
Questions on the website: 13722362