An excavation company has been contracted to supply 10 million cubic feet (cu. ft.) of dirt to a construction site. the company uses a bulldozer to collect dirt, which is then moved to by dump truck to the construction site. it costs the company $100 per hour to use the bulldozer, and it rents dump trucks at a rate of $40 per hour per truck. each dump truck can hold 1,000 cu. ft. of dirt, and it takes an average of 12 minutes for the bulldozer to load a dump truck with dirt. it takes an average of five minutes for a fully loaded dump truck to deliver the dirt to the construction site and returns to the bulldozer for another load. assuming that the time to load a dump truck and the time for a dump truck to deliver the dirt to the construction site and return to the bulldozer follow exponential distributions, determine the most appropriate queuing model for the dirt-moving process and then use that model to determine how many dump trucks to rent in order to minimize the expected cost of fulfilling the contract.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:30
Find two rational expressions that have the difference of 2-n/n-4
Answers: 1
question
Mathematics, 21.06.2019 20:20
Can some one explain this i got sent this. is this a threat i’m scared
Answers: 1
question
Mathematics, 21.06.2019 20:30
Solve each quadratic equation by factoring and using the zero product property. n^2 - 49 = 0
Answers: 2
question
Mathematics, 21.06.2019 22:50
Type the correct answer in the box. use numerals instead of words. if necessary, use / for the fraction bar.
Answers: 1
You know the right answer?
An excavation company has been contracted to supply 10 million cubic feet (cu. ft.) of dirt to a con...
Questions
question
Social Studies, 04.03.2021 08:50
question
Mathematics, 04.03.2021 08:50
question
Mathematics, 04.03.2021 08:50
question
Social Studies, 04.03.2021 08:50
question
Mathematics, 04.03.2021 09:00
Questions on the website: 13722363