As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina and a binder) are tested for purity. the process requires that the purity of the alumina be greater than 85%. a random sample from a recent shipment of alumina yielded the following results (in percent):
93.2 87.0 92.1 90.1 87.3 93.6
a hypothesis test will be done to determine whethe or not to accept the shipment.

(a) state the appropriate null and alternate hypotheses.
(b) compute the p-value.
(c) should the shipment be accepted? explain.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Lee has $1.75 in dimes and nickels. the number of nickels is 11 more than the number of dimes. how many of each coin does he have?
Answers: 1
question
Mathematics, 21.06.2019 18:30
Sasha drank 8 bottles of water everyday for a week. how many bottles of water did she drink in total?
Answers: 2
question
Mathematics, 21.06.2019 20:00
Ialready asked this but i never got an answer. will give a high rating and perhaps brainliest. choose the linear inequality that describes the graph. the gray area represents the shaded region. y ≤ –4x – 2 y > –4x – 2 y ≥ –4x – 2 y < 4x – 2
Answers: 1
question
Mathematics, 21.06.2019 20:00
Adam used 1072.4 gallons of water over the course of 7 days. how much water did adam use, on average, each day?
Answers: 1
You know the right answer?
As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina...
Questions
question
English, 21.05.2020 23:02
Questions on the website: 13722363