subject
Mathematics, 23.10.2019 00:00 HybridShadow3942

Acomputer programmer charges $45 an hour for a coding projects plus a start-up fee of $150.

*write an equation in slope-intercept form to represent the total cost, y, of a project that takes x hours.

*how much does the programmer charge for a coding project that takes 25 hours?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 13:10
Two different linear functions are shown below with two points given from each function. use slope-intercept form or point-slope form to find the equation of each. linear function a points: (–5, –2), (–5, 7) linear function b points: (7, –5), (–2, –5) function a has: the equation of line a is: function b has: the equation of line b is:
Answers: 1
question
Mathematics, 21.06.2019 16:40
What is the average rate of change for this function for the interval from x=2 to x=4 ?
Answers: 2
question
Mathematics, 21.06.2019 18:50
The random variable x represents the number of phone calls an author receives in a day, and it has a poisson distribution with a mean of 8.7 calls. what are the possible values of x
Answers: 1
question
Mathematics, 21.06.2019 20:40
In a 45-45-90 right triangle, what is the ratio of the length of one leg to the length of the other leg? а . 1: 2 в. 2: 1 с. 2: 1 d. 1: 1
Answers: 1
You know the right answer?
Acomputer programmer charges $45 an hour for a coding projects plus a start-up fee of $150.
Questions
question
Biology, 17.03.2020 22:29
question
Mathematics, 17.03.2020 22:29
Questions on the website: 13722363