subject
Mathematics, 16.10.2019 08:30 brainbean

Anew machine makes 20,000 aluminum cans three times faster than an older machine. with both machines operating, it takes 15 h to make 20,000 cans. how long would it take the new machine, working alone, to make 20,000 cans?

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
Ineeeeed this is due tomorrow and i dont know the answer can you find all the exponents
Answers: 1
question
Mathematics, 21.06.2019 22:30
What is the common difference for this arithmetic sequence? -6,-2,2,6,10 a.4 b.5 c.3 d.6
Answers: 1
question
Mathematics, 22.06.2019 01:30
Identify all the cases where non-probability sampling is used when attempting to study the characteristics of a large city. studies on every subject in the population divide a population in groups and obtain a sample studies with a limited amount of time demonstrate existing traits in a population studies with the nth person selected
Answers: 2
question
Mathematics, 22.06.2019 03:10
What is the base of the exponential expression of 4 to the power of 5
Answers: 1
You know the right answer?
Anew machine makes 20,000 aluminum cans three times faster than an older machine. with both machines...
Questions
question
Mathematics, 28.11.2020 05:10
question
Mathematics, 28.11.2020 05:10
question
Mathematics, 28.11.2020 05:10
Questions on the website: 13722367