Mathematics, 06.10.2019 02:00 boo3972

This exercise illustrates that poor quality can affect schedulesand costs. a manufacturing process has 100 customer orders tofill. each order requires one component part that is purchased froma supplier. however, typically, 2% of the components are identifiedas defective, and the components can be assumed to beindependent. a)if the manufacturer stocks 100 components, what is theprobability that the 100 orders can be filled without reorderingcomponents? b) if the manufacturer stocks 102 components, what is theprobability that the 100 orders can be filled without reorderingcomponents? c) if the manufacturer stocks 105 components, what is theprobability that the 100 orders can be filled without reorderingcomponents?

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 14:50
Simplify 5 square root of 7 end root plus 12 square root of 6 end root minus 10 square root of 7 end root minus 5 square root of 6 . (1 point) 5 square root of 14 end root minus 7 square root of 12 5 square root of 7 end root minus 7 square root of 6 7 square root of 12 end root minus 5 square root of 14 7 square root of 6 end root minus 5 square root of 7
Answers: 2
question
Mathematics, 21.06.2019 16:00
Hello people, i have a math question that i need with, me, i will give the correct one brainiest, and for the other correct people, a and 5 stars.
Answers: 3
question
Mathematics, 21.06.2019 19:30
Acar started driving from city a to city b, distance between which is 620 miles, at a rate of 60 mph. two hours later a truck left city b and started moving towards city a at a rate of 40 mph. how many hours after the truck's departure will the two meet?
Answers: 1
question
Mathematics, 21.06.2019 19:50
The probability that a student graduating from suburban state university has student loans to pay off after graduation is .60. if two students are randomly selected from this university, what is the probability that neither of them has student loans to pay off after graduation?
Answers: 2
You know the right answer?
This exercise illustrates that poor quality can affect schedulesand costs. a manufacturing process h...