M5_a3. the expected project completion time for the construction of a pressure vessel is 18 monthsand the project variance is 7. (note: when using the z tables – round your z values to two decimal placesbefore getting the probabilities from the tables. do not round standard deviations prior to calculating zvalues)note: enter probabilities as decimals (i. e 92.31% should be entered as 0.9231)a) what is the probability that the project will require at least 19 months? (enter 4 decimal placesfrom distribution tables)b) what is the probability that the project will be completed within 24 months? (enter 4 decimalplaces from distribution tables)c) what is the probability that the project will require at least 21 months? (enter 4 decimal placesfrom distribution tables)d) what is the probability that the project will be completed within 15 months? (enter 4 decimalplaces from distribution tables)e) what is the probability that the project will take between 16 and 24 months to complete? (enter4 decimal places from distribution tablesshow work

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 12:40
20 ! need which shows a difference of squares? 10y^2-4x^2 16y^2-x^2 8x^2-40x+25 64x^2-48x+9
Answers: 2
question
Mathematics, 21.06.2019 14:40
The class wants to raise a total of $750.if they receive a profit of $1.25 from each candybar sold, how many bars must they sell to reachtheir goal
Answers: 1
question
Mathematics, 21.06.2019 18:00
What are the coordinates of the midpoint of ab? ,1/2) /2,-1) ,-3/2) /2,-2)
Answers: 1
question
Mathematics, 21.06.2019 18:00
Solve this system of equations. 12x βˆ’ 18y = 27 4x βˆ’ 6y = 10
Answers: 1
You know the right answer?
M5_a3. the expected project completion time for the construction of a pressure vessel is 18 monthsan...
Questions
question
English, 18.12.2019 02:31
Questions on the website: 13722361