subject
Mathematics, 20.09.2019 17:20 borsha255

the hoover dam in the u. s produces 2 x 10 ^9 watts of electricity and is composed of 7 x 10^9 kg of concrete. concrete requires 1mj of energy to produce 1 kg
1) how much energy did it take to produce the dam?
2) how long is the "energy payback time" for the dam?
show your work.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 22:00
Which is the correct first step in finding the area of the base of a cylinder with a volume of 26x cubic meters and a height of 6.5 meters? v=bh 6.5=b(26x) v=bh v=26pi+(6.5) v=bh v=26pi(6.5) v=bh 26pi=b(6.5)
Answers: 1
question
Mathematics, 21.06.2019 22:20
Cone a has a surface area of 384 ft2 and cone b has a surface area of 96 ft? . what is the ratio of their volume?
Answers: 1
question
Mathematics, 21.06.2019 22:30
Which statements are true about additional information for proving that the triangles are congruent check all that apply
Answers: 1
question
Mathematics, 22.06.2019 00:20
The circle below is centered at the point (3, 1) and has a radius of length 2. what is the equation?
Answers: 1
You know the right answer?
the hoover dam in the u. s produces 2 x 10 ^9 watts of electricity and is composed of 7 x 10^9 kg of...
Questions
question
Chemistry, 29.07.2021 01:40
question
English, 29.07.2021 01:40
question
English, 29.07.2021 01:50
Questions on the website: 13722363