subject
Mathematics, 09.09.2019 22:10 fluffpupkiki

Begin by translating polygon abcd. create a line segment of length 5 units to the right of points a, b, c, and d. connect the points you created to form a polygon that is congruent to abcd. when you’re done, you’ll have translated polygon abcd to the right by 5 units.
measure the slopes of the line segments (i. e., construction paths) you created. record the measurements in the table.

ansver
Answers: 3

Another question on Mathematics

question
Mathematics, 21.06.2019 18:00
You paid 28.00 for 8 gallons of gasoline. how much would you pay for 15 gallons of gasoline?
Answers: 1
question
Mathematics, 21.06.2019 18:30
At the olympic games, many events have several rounds of competition. one of these events is the men's 100-meter backstroke. the upper dot plot shows the times (in seconds) of the top 8 finishers in the final round of the 2012 olympics. the lower dot plot shows the times of the same 8 swimmers, but in the semifinal round. which pieces of information can be gathered from these dot plots? (remember that lower swim times are faster.) choose all answers that apply: a: the swimmers had faster times on average in the final round. b: the times in the final round vary noticeably more than the times in the semifinal round. c: none of the above.
Answers: 2
question
Mathematics, 21.06.2019 19:30
Aproduction manager test 10 toothbrushes and finds that their mean lifetime is 450 hours. she then design sales package of this type of toothbrush. it states that the customers can expect the toothbrush to last approximately 460 hours. this is an example of what phase of inferential statistics
Answers: 1
question
Mathematics, 21.06.2019 21:30
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
You know the right answer?
Begin by translating polygon abcd. create a line segment of length 5 units to the right of points a,...
Questions
question
Biology, 23.05.2020 03:00
question
Social Studies, 23.05.2020 03:01
Questions on the website: 13722365