subject
Mathematics, 05.08.2019 17:30 kira3039

An open pit mine is being dug in the buffalo ridge mountain range. it will be 550 feet across and 290 feet deep. based on sampling of the area, experts project that the company will be able to retrieve an average of about 0.115 ounces of gold per ton of ore and waste mined. the mine company estimates the total cost of production will be $80 million. (assume the shape of the pit is a perfect cone.) (a) what would be the volume of ore and waste material removed during its mining operation? (b) how many ounces of gold should the company expect to recover from this mine? (assume one ton is equal to 10 cubic feet.)

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 18:30
Find an equation of the line perpendicular to the graph of 28x-7y=9 that passes through the point at (4,1)
Answers: 2
question
Mathematics, 21.06.2019 22:30
Factor the polynomial, if possible. if the polynomial cannot be factored, write prime. 9n^3 + 27n^2 – 25n – 75
Answers: 2
question
Mathematics, 21.06.2019 23:00
Find the dimensions of the circle. area = 64π in.² r= in.
Answers: 1
question
Mathematics, 22.06.2019 00:00
If 7x=9y, y/z = 7/5 , then x/z = (a) 2/7 (b) 7/9 (c) 9/5 (d) 9/7 (e) 5/9
Answers: 1
You know the right answer?
An open pit mine is being dug in the buffalo ridge mountain range. it will be 550 feet across and 29...
Questions
Questions on the website: 13722367