subject
Mathematics, 18.07.2019 05:40 deedee2616

Formulate a system of equations for the situation below and solve. a manufacturer of women's blouses makes three types of blouses: sleeveless, short-sleeve, and long-sleeve. the time (in minutes) required by each department to produce a dozen blouses of each type is shown in the following table. short long sleeveless sleeve sleeve 15 e. co cutting sewing packaging the cutting, sewing, and packaging departments have available a maximum of 93, 188, and 56 labor hours, respectively, per day. how many dozens of each type of blouse can be produced each day if the plant is operated at full capacity? sleeveless dozen short-sleeve dozen long-sleeve dozen

ansver
Answers: 2

Another question on Mathematics

question
Mathematics, 21.06.2019 23:00
Siri can type 90 words in 40 minutes about how many words would you expect her to type in 10 minutes at this rate
Answers: 1
question
Mathematics, 22.06.2019 01:50
Anew movie is released each year for 14 years to go along with a popular book series. each movie is 2 minutes longer than the last to go along with a plot twist. the first movie is 70 minutes long. use an arithmetic series formula to determine the total length of all 14 movies
Answers: 3
question
Mathematics, 22.06.2019 04:30
Arectangular garden measures 5m by 7m. both dimensions are to be extended by the same amount so that the area of the garden is doubled. by how much should the dimensions increase, to the nearest tenth of a metre?
Answers: 2
question
Mathematics, 22.06.2019 06:00
What is the length of segment tr?
Answers: 2
You know the right answer?
Formulate a system of equations for the situation below and solve. a manufacturer of women's blouses...
Questions
question
Advanced Placement (AP), 22.10.2020 22:01
question
Mathematics, 22.10.2020 22:01
question
Mathematics, 22.10.2020 22:01
question
Mathematics, 22.10.2020 22:01
question
Mathematics, 22.10.2020 22:01
Questions on the website: 13722366