subject
Mathematics, 25.06.2019 06:40 batmanmarie2004

Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line will operate 50 wk/yr, 10 shifts/wk, and 7.5 hr/shift. work units will be attached to a continuously moving conveyor. work content time is 58.0 min. assume line efficiency is 0.95, balancing efficiency is 0.93, and repositioning time is 8 sec. determine the actual number of workers required.

ansver
Answers: 1

Another question on Mathematics

question
Mathematics, 21.06.2019 17:30
What is the 12th term of b(n)=-4-2(n-1)
Answers: 1
question
Mathematics, 21.06.2019 17:30
When the solutions to each of the two equations below are graphed in the xy-coordinate plane, the graphs of the solutions intersect at two places. write the y-cordninates of the points of intersection in the boxes below in order from smallest to largest. y=2x y=x^2-3
Answers: 1
question
Mathematics, 21.06.2019 21:00
Seattle, washington is known for being rainy. one day last month, 8 inches of rain fell in 1 1/2 hours. what us the rate of the rainfall expressed in ft per plzzz write a proportion i will give you 100 points
Answers: 1
question
Mathematics, 21.06.2019 21:40
The sides of a parallelogram are 24cm and 16cm. the distance between the 24cm sides is 8 cm. find the distance between the 16cm sides
Answers: 3
You know the right answer?
Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line w...
Questions
question
Mathematics, 21.09.2019 16:30
question
Mathematics, 21.09.2019 16:30
Questions on the website: 13722363